![]() 12/21/2019 at 11:43 • Filed to: None | ![]() | ![]() |
TThe last board has been cut. The stock is gone. I am almost done with this 2 yr project
![]() 12/21/2019 at 12:09 |
|
Effin A!!!
Hmmmm ... I'm a year and a half in ... I guess I should get on it.
![]() 12/21/2019 at 12:35 |
|
So, what it the next long term project?
![]() 12/21/2019 at 13:11 |
|
Finish a room in the basement and add a second floor over the family room and install a sump pump in the basement
![]() 12/21/2019 at 14:11 |
|
What exactly is the 2 year project?
![]() 12/21/2019 at 18:06 |
|
Putting down hardwood floor.
It snowballed in to ta king a wall down which snowballed into rerunning ductwork and electrical then building bookshelves to hide the ductwork and an island in the kitchen. Last was covering the new beams and posts with rough sawn pine to give it a rustic look.
![]() 12/21/2019 at 18:26 |
|
Ge t it done tell ur wi fe it’s her Xmas present
![]() 12/21/2019 at 22:02 |
|
My wife is the reason for the delay. She won’t let me appt the polyurethane, because she knows I hate doing it, and thinks I will half-ass it. The drawer fronts have been waiting for her to seal them for over a year.