![]() 08/02/2018 at 19:17 • Filed to: houses | ![]() | ![]() |
Or as I call it, the “pre-chande lier” stage.
![]() 08/02/2018 at 19:35 |
|
Fun fact, Sonotube is a favorite material in modern indoor sub-woofer design. That’s all I can think about when I see it hahah
![]() 08/02/2018 at 19:36 |
|
Man no bath tubs anywhere? Where do the workers pee?
![]() 08/02/2018 at 19:38 |
|
That big hole in the middle of the foundation. That's one giant bathtub fer peein' in.
![]() 08/02/2018 at 19:40 |
|
‘ Still in the shit’ is what we call that stage of the building. Sometimes that stage extends right out to handover to the client...
![]() 08/02/2018 at 19:40 |
|
Directly into the septic system duhduh
![]() 08/02/2018 at 22:23 |
|
Out of curiosity, why does only that one area get the Delta-Drain and black paint?
Also looking at the Delta-Drain site, it appears that it is supposed to be installed on the outside of the wall, but here it looks to be on the inside, which seems a bit ominous?
![]() 08/02/2018 at 22:27 |
|
I have two words for you:
new construction