![]() 08/06/2018 at 20:42 • Filed to: My wallet is crying | ![]() | ![]() |
Today I finally was able to tear out this stupid penninsula/knee wall. The reason it had to wait, is the light switch for the kitchen is in this stupid thing, UNDER the counter. I finally had all the other electrical set up, and ready to go, so it time to break out the hammer, pry bars, sawzall, and oscillating tool.
Successful operation doctor .
I did manage to bleed my own blood. I think I gouged it on the plaster inside the wall.
There's definitely going to be a scar under there.
![]() 08/06/2018 at 20:58 |
|
Ah the glorious feeling of demo, but its followed by the not so glorious cleanup. But hey it was an excuse to use a sawzall.
![]() 08/06/2018 at 21:14 |
|
I hate that "why is my hand wet" feeling.
![]() 08/06/2018 at 21:20 |
|
Yep, me too.
![]() 08/06/2018 at 21:21 |
|
I don't much care for demo. I like the technical putting stuff together part much better. It went well though, all things considered.