"ModerateSloth" (moderatesloth)
09/20/2014 at 18:49 • Filed to: None | 8 | 0 |
Finally got around to posting the 6th update. A few very important/big steps have happened since my last post. The engine and transmission are officially bolted in the car. The lines for the hydraulic clutch have been run and hooked up to the main systems. The engine cooling system is well on its way to being finished and then comes the fuel lines and the rest of the wiring. Hopefully the car should be making some noise in the next 2 weeks…enjoy the pictures
Driveshaft
Hrydraulic clutch installed under the car
Fuel regulator installed
Drivers pedal box
T-5 trans with Steeda shifter installed
Radiator with FF Metal custom shroud installed
Engline coolant plumbing