"KusabiSensei - Captain of the Toronto Maple Leafs" (kusabisensei)
06/16/2014 at 19:14 • Filed to: Shoplopnik | 0 | 0 |
I believe in setting the record correct, and in being fair. So at the very least I can report that I do have my numbers, and additional thoughts on !!!error: Indecipherable SUB-paragraph formatting!!! .
!!! UNKNOWN CONTENT TYPE !!!
As I do track days, our organizers have finally gotten to the point of requiring numbers on the doors (They got bitched at by the corner workers at multiple places, so I figured it was coming). So I went online to find a place which sells magnetic panels with either sublimated numbers or cut vinyl numbers with strong adhesive.
I haven't gone and ordered a set of track outlines for my BMW (and ones for the Mini, where applicable), but since !!!error: Indecipherable SUB-paragraph formatting!!! (not to be confused with TrackDecal.com) does both, I figured "Oh hell, why not? At least if it works out, I can get the outline stickers from them."
So after I confirmed my number with the track day organizers, I placed my order on 28 May. My order confirmation said up to 5 business days to ship, and that they were a little backed up due to demand, so "we may be a few days late in shipping your order." I'm cool with that, which is why I ordered early (my event is this coming up Saturday, 21 June).
I know that things can get backed up, so that's why I normally allow for double the standard lead time before contacting. So after two weeks (13 June), I sent an email out, requesting for an updated ship time, since if I needed to get the numbers made locally, I would need some lead time to do that.
Maco responded quickly from the shop, saying that the numbers were just finished production and had been put into the post. I got them Monday, and I am pleased with the quality of the products. The magnets turned out well, and the static cling number for the windscreen is also good quality. (Sorry for the potatocam picture)
I'd order more stuff from these guys again, but I would be very mindful of the lead time for producing.
4.5/5